同城附近喝茶网_全国24小时空降可约_全国空降同城微信电话号码_全国可空降900十城市

Management of the batching room of the injection molding workshop!!

datetime:2020-06-19 13:14:01 Visits:792 Source:思柏精密

Management of the batching room of the injection workshop


1. Formulate the management system of batching room and guidelines for batching work;


2. The raw materials, toner, and mixers in the batching room should be placed in different areas;


3. The raw materials (water-containing materials) should be sorted and placed, and they must be marked well;


4. Toner should be placed on the toner rack and must be identified (toner name, toner number);


5. The mixer should be numbered/identified, and the use, cleaning and maintenance of the mixer should be done;


6. Supplies equipped with cleaning mixer (fire water, rags);


7. The prepared ingredients need to be sealed or tied with a bag sealing machine, and affixed with identification paper (specify: raw materials, toner number, use machine, ingredient date, product name/code, ingredient staff, etc.;


8. Use of ingredient kanban and ingredient notice, and do a good job of recording the ingredients;


9. The white/light color material needs to be compounded with a special mixer and keep the environment clean;


10. Train the batching personnel on business knowledge, job responsibilities and management system;


请填写下方表单,我们会尽快与您联系
感谢您的咨询,我们会尽快给您回复!
主站蜘蛛池模板: 保靖县| 东光县| 改则县| 财经| 绵竹市| 漳平市| 威海市| 竹山县| 来凤县| 合川市| 海伦市| 扬州市| 高邑县| 葵青区| 和硕县| 西林县| 平湖市| 花莲市| 晴隆县| 桐梓县| 新乐市| 石景山区| 博白县| 白沙| 汉沽区| 建平县| 友谊县| 申扎县| 陵水| 临澧县| 海南省| 平陆县| 河西区| 龙口市| 云和县| 长沙市| 航空| 崇信县| 斗六市| 新闻| 仙桃市|